显示标签为“#floorinnovation”的博文。显示所有博文
显示标签为“#floorinnovation”的博文。显示所有博文

2019年10月31日星期四

How to install Stepguard flooring




Thank you for choosing StepGuard Flooring,Please read this manual carefully and strictly follow the instructions before installation. StepGuard Warranty policy and services excludes any damages resulting caused by inappropriate installation procedures.






Required tools
Spacers Rubber Mallet Ruler Pencil Tape Measure Utility Knife

Before Installation

Floor inspection
Make sure there is no damage before installation

Loss reserved
Calculate the floor demand according to the building pavement area, and reserve 10-15% of the floor for cutting loss.

Environmental adaptation
It needs to be placed in the installation space one day in advance to adapt to the new environment. The temperature is controlled between 18-29℃ degrees . Take care to avoid direct sunlight and large temperature changes, and let the floor slowly adapt to the local temperature and humidity.

Level measurement
Clean and dust the ground, make sure there is no debris on the ground, and check whether the ground is clean and flat. The height difference of the ground should be less than 3mm within 2 meters (recommended ≤ 2mm)

Environment Prohibition
Can not be used directly as a moisture barrier. This product must not be installed in saunas, outdoors, or areas that have been soaked for long periods of time.

Gap reserved
Make sure to leave a gap of 5-8 mm between the wall and the fixtures (such as pipes and pillars, stairs, etc.). These gaps will be covered with decorative lines after the installation.
Tip: drill a hole 20 mm larger than the pipe diameter 

Direction Determination
Determine the installation direction of the floor, and install the length of the floor parallel to the direction in which the sunshine comes

In Installation


1、 Inspect the floor, place the side with the raft on the wall, and leave a 5-8mm expansion joint between the floor and the wall.stepping forbidden within 24 hours after the installation completed , and the wooden wedge cant taken out till 24 hours later.

2、 The first piece floor of the second row, install on the long side, insert the raft of the floor into the groove of the first row of floors and lifts the floor slightly upwards at an angle of 30 degrees until the joint position flattens the floor to make it tightly joined. .

3、 The floor to be laid should be wedged into the correct position as described above.

4、 When weaving in the longitudinal direction, the distance between the front part of the panel and the front should be as small as possible. Then use the slab to tap the short side horizontally to make them join together. The specially designed lock will automatically buckle.


After Installation

Please maintain a suitable indoor temperature after installation. Excessive or too low indoor temperatures can cause the product to expand or shrink, which may affect the floor quality or User Experience.

Call Stepguard flooring for a Yue installation service 400 629 9929 

2019年10月16日星期三

StepGuard flooring,StepGuard life?

Due to the floor revolution new stone crystal floor category created by StepGuard,a new floor lifestyle is happening quietly,StepGuard is bringing warmth to this coming cold winter with full of smile.cute baby,shaped daddy,loved mummy,aren't they?
STEPGUARD,belongs to J&R Group,since 1993,from USA.
Its main and star products are the STEPGUARD Stone Crystal Floor.
J&R always pays attention to the needs of consumers and spares no effort to provide consumers with quality life products.
In 2015, researched in the Los Angeles R&D Center of J&R GROUP USA., through the millions times of organic experiments of the magical element of Calcium Carbonate, with bionic nanotechnology, a new material Stone Crystal was discovered. Molecular recombination after new arrangement, we cultivate a excellent material pure as pearls, clear as crystal and durable as stone,It was subtly applied to the production of the floor extruded process, which gave birth to floor a new category - Stone Crystal floor.



In order to satisfy consumers' needs,StepGuard Flooring gotta Eight Collection :
MarbleTek, QuiteTek, CorkTek,BeveledTek,SelectedTek,MassiveTek,HerringboneTek and Customized.








Want StepGuard Stone Crystal Floor?
www.stepguard-usa.com
sales@stepguard-usa.com

VIP Hotline: 400 629 9929